Initial Need:In the Electrical and Control Unit of Bandar Imam Petrochemical, a dedicated cooling system was required to maintain stable
-
Initial Need:The villa project in Lavasan required an HVAC system capable of precise zoning and efficient performance due to the
-
Initial Need:After equipping its data center and server rooms, the Ministry of Communications and Information Technology required an advanced and
-
Initial Need:In 2023 (1402), Qazvin University of Medical Sciences required a full fresh-air hygienic chiller and air handling units (AHUs)
-
Initial Need:In a new residential complex, after calculating the total cooling load of the building, the client sought to provide
-
Initial Need:Puls Niro Company required a four-season industrial cooling system with precise capacity and appropriate pressure to cool advanced machinery
-
Initial Need:In 2019 (1398), Almas Commercial Complex was using an old absorption chiller system that, due to frequent breakdowns, high
-
Initial Need:At the Adineh 24-hour Clinic, considering the previously installed ductwork structure, there was a need to provide an air