Bandar Imam Petrochemical Project – Mahshahr

Initial Need:In the Electrical and Control Unit of Bandar Imam Petrochemical, a dedicated cooling system was required to maintain stable

ویلایی لواسان

-

HVAC System Project – Villa in Lavasan

Initial Need:The villa project in Lavasan required an HVAC system capable of precise zoning and efficient performance due to the

وزارت ارتباطات

-

Screw Chiller Project – Ministry of Communications and Information Technology

Initial Need:After equipping its data center and server rooms, the Ministry of Communications and Information Technology required an advanced and

دانشگاه قزوین

-

Chiller and Air Handling Unit Project – Qazvin University of Medical Sciences

Initial Need:In 2023 (1402), Qazvin University of Medical Sciences required a full fresh-air hygienic chiller and air handling units (AHUs)

مجتمع مسکونی یزد

-

Mini Chiller System Implementation Project – Yazd Residential Complex

Initial Need:In a new residential complex, after calculating the total cooling load of the building, the client sought to provide

پروژه پالس نیرو

-

Cooling System Project – Puls Niro Company

Initial Need:Puls Niro Company required a four-season industrial cooling system with precise capacity and appropriate pressure to cool advanced machinery

مجتمع تجاری الماس

-

Air-Cooled Chiller Project – Almas Commercial Complex

Initial Need:In 2019 (1398), Almas Commercial Complex was using an old absorption chiller system that, due to frequent breakdowns, high

درمانگاه شبانه روزی ادینه

-

AHU System Project – Adineh Clinic, Urmia

Initial Need:At the Adineh 24-hour Clinic, considering the previously installed ductwork structure, there was a need to provide an air